Whole Reach

WholeReach · industry directory

Architecture Firms

The companies that define the architecture firms industry, each read on the same nine-check website rubric — a 0–100 score with the exact fixes — alongside the concepts, the developments and the questions that shape the field.

34companies tracked
24sites scored
75average site score
10blocked our scanner

The companies

24 companies in the architecture firms industry, each graded on the nine things that decide whether a buyer or an AI assistant can find and trust them online. Open any name for the full write-up and the specific fixes.

CompanyHQ / regionSite score
Lumionlumion.comNetherlands (global)100 0 to fix
BQE Corewww.bqe.comUS (global)92 1 to fix
Genslerwww.gensler.comUS (global, incl. Austin, TX)92 1 to fix
Graphisoft Archicadwww.graphisoft.com/en-us/plans-and-products/archicadHungary (global)92 1 to fix
SketchUpwww.sketchup.comUS (global)88 1 to fix
Studio8 Architectsstudio8architects.comUS (Austin, TX)84 2 to fix
BNIMwww.bnim.comUS (Kansas City — national)80 2 to fix
Deltek Vantagepointwww.deltek.com/products/erp/vantagepointUS (global)80 2 to fix
McKinney York Architectsmckinneyyork.comUS (Austin, TX)80 2 to fix
Monographmonograph.comUS (national)80 2 to fix
Pagepagethink.comUS (Austin & Houston, TX)80 2 to fix
STG Designstgdesign.comUS (Austin, TX)76 3 to fix
Enscape (Chaos)www.chaos.com/enscapeGermany/US (global)74 3 to fix
Bjarke Ingels Group (BIG)big.dkDenmark/US (global)72 3 to fix
Furman + Keil Architectswww.fkarchitects.netUS (Austin, TX)72 3 to fix
Corganwww.corgan.comUS (Dallas, TX — national)70 3 to fix
Rhino (Robert McNeel & Associates)www.rhino3d.comUS (global)70 3 to fix
Perkins&Willperkinswill.comUS/Canada (global)68 3 to fix
Andersson-Wise Architectsanderssonwise.comUS (Austin, TX)64 4 to fix
Morpholiomorpholioapps.comUS (global)62 4 to fix
Miró Rivera Architectsmirorivera.comUS (Austin, TX)60 4 to fix
Grasshopperwww.grasshopper3d.comUS (global)59 4 to fix
Snøhettawww.snohetta.comNorway/US (global)58 4 to fix
Alterstudio Architecturealterstudio.netUS (Austin, TX)52 5 to fix

70+ solid   45–69 gaps   under 45 costing customers

Sites we couldn’t reach

10 businesses whose website blocked our scanner — common when a site filters datacenter traffic, and not a sign the site is broken. A blocked site is never scored zero.

Autodesk Revit · www.autodesk.com/products/revit/overview ↗Bluebeam · www.bluebeam.com ↗Clayton Korte · www.claytonkorte.com ↗HKS · www.hksinc.com ↗HOK · www.hok.com ↗Lake|Flato Architects · www.lakeflato.com ↗Michael Hsu Office of Architecture · www.hsuoffice.com ↗Nelsen Partners · www.nelsenpartners.com ↗Overland Partners · www.overlandpartners.com ↗Skidmore, Owings & Merrill (SOM) · www.som.com ↗

Who defines the architecture firms market

The firms, funds and institutions that set the terms in architecture firms — context, not local listings; never scored.

AIA 2030 Commitmentauthority

The AIA program in which signatory firms — over 1,300 of them — report predicted energy performance across their entire active portfolio each year through the Design Data Exchange, working toward net zero operational carbon by 2030. Signatory status and reported portfolio EUI reduction now appear as qualifications in institutional and corporate RFPs.

AIA Austinauthority

The Austin chapter of the AIA — the local design awards program, continuing education, the Austin Homes Tour, advocacy on city land development code and permitting issues, and the professional network in which local firms are known to each other and to clients. Chapter involvement is a meaningful local credibility signal in Austin.

AIA Contract Documentsauthority

The publisher of the standard agreements the US construction industry runs on — B101 for owner-architect services, A101 and A201 for owner-contractor and general conditions, C401 for architect-consultant, plus design-build and IPD families. Because courts and insurers are familiar with the language, deviating from it is a decision that should be made deliberately.

Alterstudio Architecturecompetitor

Austin studio concentrated on rigorously detailed modern custom houses, frequently published nationally and recognized with AIA design awards. The competitor for Austin clients who are buying architecture as a discipline rather than a service.

Andersson-Wise Architectscompetitor

Austin-based architecture and design studio known for quiet, site-responsive residential, hospitality and cultural work across Texas and the mountain west. Competes on design reputation and a long publication record in the luxury residential and boutique hospitality market.

ArchDailyauthority

The most-visited architecture website in the world, publishing project documentation at high volume with plans, sections and full credits. Its open submission process makes it the most accessible route to international visibility for a small or mid-size firm, and its archive functions as a working reference library.

Architectural Recordauthority

The AIA's official magazine and the profession's oldest continuously published US journal. Covers built work, practice, technology and continuing education, and runs the annual Design Vanguard and Record Houses programs. Publication here is a career and firm credential, not just press.

ARE 5.0authority

The Architect Registration Examination, organized into six divisions mirroring the arc of a real project: Practice Management, Project Management, Programming & Analysis, Project Planning & Design, Project Development & Documentation, and Construction & Evaluation. Divisions may be taken in any order and use multiple-choice, hot spot, drag-and-place and case-study formats. Passing all six, plus an accredited degree and completed AXP hours, is the path to registration.

Autodesk Revittechnology source

The dominant BIM authoring platform in US architectural practice and the effective default for coordinated multidiscipline documentation. Families, worksharing, schedules and view templates make it the production backbone; its subscription cost and file-format lock-in are the profession's most persistent complaints, and its centrality means a firm's Revit standards are a real operational asset.

Bjarke Ingels Group (BIG)competitor

A Copenhagen- and New York-based practice known for concept-driven, highly communicable projects and masterplans. Its diagram-first storytelling reset client expectations about how a design idea should be pitched — a competitive influence far beyond the projects it actually wins.

Bluebeamtechnology source

The AEC industry's standard for PDF markup, quantity takeoff, overlay comparison between drawing revisions, and Studio Sessions for simultaneous multi-party redlining. The de facto tool for drawing review, punch lists and submittal markup across architects, engineers and contractors alike.

BNIMcompetitor

A firm whose reputation is built almost entirely on sustainable and high-performance design — an early force behind the AIA Committee on the Environment and the Living Building Challenge, and an AIA Architecture Firm Award recipient. The reference point for a practice competing on performance credentials rather than scale.

BQE Coretechnology source

Time tracking, billing, project accounting and business intelligence aimed at architecture and engineering firms, with strong invoicing flexibility for percentage-of-construction, hourly-with-multiplier and fixed-fee arrangements. A common step up for a growing firm outgrowing spreadsheets and generic accounting software.

City of Austin Development Services Departmentauthority

The Authority Having Jurisdiction for building permits, site plan review, zoning verification, inspections and code enforcement inside Austin city limits. Its review queues, submittal requirements and adopted code amendments set the real schedule on every Austin project — which is why local permitting fluency is a competitive asset.

Clayton Kortecompetitor

Austin and San Antonio practice widely published for restrained, material-driven residential, hospitality, winery and Hill Country ranch work — including projects that have circulated internationally on ArchDaily and Dezeen. A design-credibility competitor in the high-end residential and boutique hospitality segment.

Corgancompetitor

Dallas-based and one of the largest US firms, with dominant positions in aviation terminals and data center design plus strong workplace, education and interiors practices. Its data center specialization is a notable defensible niche and directly relevant in a Central Texas market drawing hyperscale investment.

Deltek Vantagepointtechnology source

The enterprise standard for architecture and engineering firm management — project accounting, resource planning, CRM and business development pipeline, timesheets, utilization and multiplier reporting in one system. Deltek's annual Clarity A&E study, drawn from this customer base, is the industry's most-cited benchmarking source for utilization, multiplier and profitability.

Dezeenauthority

One of the most-read architecture and design publications worldwide, with enormous reach beyond the profession into a general design-interested audience. Getting a project placed on Dezeen reaches clients, not just peers — which makes it the highest-leverage publication target for a design-led practice.

Enscape (Chaos)technology source

A real-time rendering plugin that lives inside Revit, Rhino, SketchUp and Archicad, so imagery updates as the model changes rather than requiring a separate export-and-render cycle. Now part of Chaos alongside V-Ray. It collapsed visualization from a specialist deliverable into something a project architect does during a working session, and its VR mode is standard in healthcare and workplace user-group meetings.

Furman + Keil Architectscompetitor

Austin studio focused on custom residential, small commercial and institutional projects with a sustainability emphasis and repeated AIA Austin recognition. A representative boutique competitor in the high-end Austin residential segment.

Genslercompetitor

The largest architecture firm in the world by revenue and headcount, with roughly 6,000 staff across more than 50 offices including Austin. Practices across workplace, mixed-use, aviation, retail, hospitality and brand design, and publishes widely cited workplace and experience research. The default incumbent on large corporate and institutional shortlists — competitors position against it on principal access and design specificity rather than capability.

Graphisoft Archicadtechnology source

The longest-established BIM authoring tool and the principal alternative to Revit, with a strong following among design-led and residential practices for its more direct modeling workflow, native Mac support and openBIM/IFC commitment. Common in Europe and among US firms that resisted Revit standardization.

Grasshoppertechnology source

The visual programming environment inside Rhino that made computational design accessible to architects without writing code. Drives parametric facades, daylight and environmental analysis through plugins like Ladybug and Honeybee, structural optimization, and generative option studies — the foundation of most computational design groups in practice.

HKScompetitor

Dallas-headquartered global firm best known for healthcare and major sports venues, plus hospitality, commercial and residential work. Runs a substantial in-house research group on design and health outcomes, which is a strong differentiator in healthcare pursuits.

Architecture Firms guides

Choosing an architect

The highest-intent decision page: when a project needs a licensed architect at all, how to read a portfolio past the hero shots, what to ask in an interview, how to check registration with the state board, and what a good fit actually looks like by project type and budget.

Services & scope by phase

What the client actually receives at each of the five AIA phases — SD, DD, CD, bidding/negotiation, and construction administration — plus pre-design, programming and feasibility work that sits ahead of them. The page that stops scope disputes before they start.

Project types & sector expertise

A page per building type — workplace, multifamily, hospitality, retail, healthcare, education, civic, industrial, mixed-use, single-family residential. Sector depth is how large clients shortlist, and how buyers search.

Residential architecture

Custom homes, renovations, additions and ADUs — the segment with the highest search volume and the lowest average fee. Covers what a residential architect does that a plan service or design-build contractor does not.

Commercial, workplace & mixed-use

Ground-up commercial, tenant improvement and workplace strategy work: how core-and-shell differs from TI, how landlord work rules differ from owner-occupier work, and how post-pandemic occupancy patterns reshaped the brief.

Adaptive reuse & renovation

Existing-building work — office-to-residential conversion, historic rehabilitation, shell repositioning — including existing-conditions survey, structural and MEP feasibility, code-triggered upgrades, and why reuse is now the lowest-carbon move available.

Fees, contracts & what it costs

How architects charge: percentage of construction cost, hourly with a multiplier, fixed fee, or per square foot. Plus AIA B101, additional services, reimbursables, and the fee conversation clients most want a straight answer on.

Permitting & entitlements in Austin

Central Texas ground truth: site plan review, zoning entitlement, variance and Board of Adjustment, historic review, impact fees, and realistic timelines through the City of Austin Development Services Department. The page that proves local knowledge.

Codes, accessibility & life safety

IBC, local amendments, occupancy classification, egress, fire ratings, ADA and Texas Accessibility Standards — the technical spine of a set of construction documents and the source of most plan-review comments.

Sustainability & building performance

LEED, WELL, Passive House, Living Building Challenge, the AIA 2030 Commitment, EUI targets, energy modeling, daylighting, and embodied carbon — now a client requirement on institutional and corporate work rather than an upsell.

BIM & the design technology stack

Revit and Archicad as authoring platforms, Rhino and Grasshopper for geometry and computation, Enscape, Lumion and Twinmotion for visualization, Bluebeam for markup, plus BIM execution planning, LOD, clash detection and model handover.

Delivery methods & working with builders

Design-bid-build, design-build, CM at risk and IPD — what each does to the architect's risk, fee and authority, plus value engineering, constructability review, and how to keep design intent through a GMP negotiation.

Portfolio, photography & project storytelling

How a firm turns finished work into new work: professional architectural photography, project narratives, awards submissions, publication in Architectural Record, Dezeen and ArchDaily, and structured case studies that answer a prospect's real question.

The business of architecture

Firm operations and financial health: utilization rate, net multiplier, backlog, net service revenue, staffing plans, project manager vs principal-in-charge roles, ownership transition, and professional liability insurance.

Licensure, careers & the talent pipeline

NAAB-accredited degrees, AXP experience hours, ARE 5.0's six divisions, Texas registration through TBAE, reciprocity via NCARB certificate, and the profession's widening gap between graduates and licensed practitioners.

AI in architectural practice

Where generative tools genuinely help — massing studies, site test-fits, rendering, spec and code research, proposal writing — and where they create liability: unverified code answers, hallucinated product data, and work product a sealing architect must still stand behind.

Concepts

Pre-design, programming & feasibility
The work before design: establishing what the building must contain and do. Programming counts the spaces and their adjacencies; a feasibility study tests whether the program fits the site, the zoning and the budget. Often sold as a separate contract so a client can stop before committing to full design.
Owner's Project Requirements (OPR) & basis of design
The OPR is the owner's written statement of goals, performance criteria and success measures; the basis of design (BOD) is the design team's written explanation of how the design meets them. Together they are the reference document for commissioning and the first thing pulled when a dispute starts.
Schematic Design (SD)
The first design phase: overall form, massing, plan organization and site strategy, tested against program and a preliminary budget. Deliverables are diagrammatic — enough for the owner to approve a direction, not enough to build from.
Design Development (DD)
The approved schematic is resolved: dimensions fixed, structural and MEP systems selected, major materials and assemblies chosen, key details studied. Ends with a set detailed enough for a reliable cost estimate.
Construction Documents (CD)
The drawings and specifications a contractor builds from and a jurisdiction reviews for permit. The largest phase by fee share and hours, and where errors become expensive because they surface as RFIs and change orders on site.
Bidding & negotiation
The phase between a finished CD set and a signed construction contract: issuing documents to bidders, running the pre-bid meeting, answering bidder questions through addenda, and helping the owner evaluate bids and award.
Construction Administration (CA)
The architect's role during construction — site observation, answering RFIs, reviewing submittals, certifying pay applications, issuing supplemental instructions, and punch list. The architect administers the contract; the contractor controls means and methods, and the distinction is a liability firewall.
Request for Information (RFI)
A contractor's formal written question about the documents. A high RFI count is read as a signal of document quality, so tracking RFIs per drawing or per million dollars of construction is a common internal quality metric.
Submittal & shop drawing review
The contractor submits product data, samples and fabrication drawings; the architect reviews only for conformance with design intent, not for dimensional accuracy or quantity. That limited review scope is deliberate and is stated on every stamp.
Addendum
A formal change to the bid documents issued before the construction contract is signed. Everything after that point is a change order instead — the timing difference is the whole distinction.
Change order
A signed modification to the construction contract adjusting scope, cost or schedule. Owner-driven changes are expected; changes traced to document errors or omissions are where professional liability exposure lives.
Punch list
The list of incomplete or non-conforming items compiled at substantial completion. Working it off is the last phase of construction administration and the most common source of end-of-project friction.
Substantial completion & certificate of occupancy
Substantial completion is the contractual milestone where the owner can occupy for the intended use — it starts warranties and shifts risk. The certificate of occupancy is the separate legal permission from the jurisdiction to occupy. They usually arrive close together but are not the same thing.
AIA B101 owner-architect agreement
The standard AIA contract between owner and architect for full design services. Defines the basic-services phases, additional services, the architect's construction-phase role, fee structure, and limitations of liability. The industry default, and the document a client should be walked through rather than handed.
Standard of care
The legal benchmark an architect is measured against: the skill and diligence ordinarily used by architects practicing under similar conditions in the same locality at the same time. Not perfection — which is why contract language promising a 'perfect' or 'error-free' set is a trap that can void insurance coverage.
Professional liability / errors & omissions (E&O)
The insurance covering claims arising from professional negligence. Written on a claims-made basis, so coverage must stay continuous for years after a project closes. Premiums track revenue, project type and claims history, and a client's certificate-of-insurance requirements often set the minimum limits a firm must carry.
Level of Development (LOD)
A shared scale (LOD 100 through 500) describing how reliable a BIM element's geometry and data are at a given moment. Prevents the classic failure where a contractor takes dimensions off a model element that was never meant to be measured.
BIM Execution Plan (BEP)
The agreement among project team members on how the model will be built and used: software versions, shared coordinates, file exchange cadence, model ownership, naming conventions and LOD by element. Skipping it is the leading cause of coordination failure on multi-consultant projects.
Clash detection
Automated checking of federated models for physical conflicts — duct through beam, sprinkler through light fixture. Catching them in the model is orders of magnitude cheaper than catching them in the field, which is the core BIM value argument.
Revit family
A parametric component in Revit — a door, window, casework unit, light fixture — carrying geometry plus data. A firm's curated family library is real intellectual property: it encodes standard details, tested assemblies and consistent schedules across every project.
As-builts & redlines
Redlines are hand markups on a printed or digital set recording changes; as-builts (record drawings) are the updated documents reflecting what was actually constructed. Accurate as-builts are what make future renovation, adaptive reuse and facility management possible — and are chronically neglected.
Stamp & seal
The registered architect's seal applied to drawings submitted for permit, signifying they were prepared by or under the responsible control of that architect. It is a legal act, not a formality — sealing work you did not control is a licensure violation in every state.
Authority Having Jurisdiction (AHJ)
Whichever body actually enforces the code on this project — city building department, fire marshal, health department, state agency, or several at once with conflicting interpretations. Knowing the local AHJ's habits is a large part of what regional experience is worth.
Code review
The systematic analysis of a design against the applicable codes: occupancy classification, construction type, allowable area and height, egress capacity and travel distance, fire separation, accessibility. Usually summarized on a code plan sheet that is the first thing a plan reviewer opens.
International Building Code (IBC)
The model building code published by the International Code Council and adopted, with local amendments, by most US jurisdictions. The adopted edition and the amendments matter more than the base code — they vary city to city and change on a cycle.
Zoning entitlement
The land-use approvals that establish what may be built on a site before any building permit is possible — rezoning, planned unit development, conditional use, height or density bonuses. Entitlement risk and timeline usually dwarf design risk on a development project.
Setback & floor-area ratio (FAR)
Setback is the minimum required distance from a structure to a property line; FAR is the ratio of allowed building floor area to lot area. Together with height limits and impervious cover they define the invisible envelope a scheme must fit — the first constraint tested in any feasibility study.
Impact fee
A one-time charge assessed by a jurisdiction on new development to fund the water, wastewater, roadway or park capacity it consumes. Often a material line in a project pro forma and a genuine surprise to first-time developers.
Site plan approval
Municipal review of a proposed site's layout — access, parking, drainage and detention, utilities, landscaping, tree preservation, impervious cover. In Austin this is frequently the longest single item on the schedule and drives when construction can actually start.
Variance
Formal permission to deviate from a zoning requirement, granted by a board of adjustment on a showing of hardship specific to the property. Discretionary, public, and slow — a scheme that needs one is a scheme with schedule risk.
Historic review
Additional design review for properties that are landmarked or sit in a historic district, judged against preservation standards. Governs demolition, additions, window replacement and exterior materials, and adds a review body with its own calendar.
ADA & accessibility compliance
Designing to the ADA Standards for Accessible Design and, in Texas, the Texas Accessibility Standards — accessible routes, clearances, reach ranges, restroom configurations, signage. Enforced through both plan review and private civil litigation, which makes it a live liability rather than a checklist item.
Egress & occupancy classification
Occupancy classification (assembly, business, mercantile, residential, institutional and so on) sets the code requirements a building must meet; egress is the resulting system of exits, corridors, stairs and travel distances that lets occupants get out. Get the classification wrong and every downstream calculation is wrong.
Fee basis & the multiplier
Architects price three main ways: a percentage of construction cost (typically single digits to mid teens depending on type and complexity), hourly against direct labor, or a fixed fee. The multiplier converts raw hourly labor into a billing rate by covering overhead and profit — a net multiplier near 3.0 is a common target, and a firm that prices below its true multiplier loses money on every hour it sells.
Utilization rate & billable ratio
The share of an employee's or the firm's total hours charged to billable projects. Too low and overhead is eating the firm; too high and nobody is doing business development, mentoring or quality review. The single most watched operational number in a design practice.
Backlog
Contracted but unearned fee — the work already signed and still to be delivered, usually expressed in months of revenue. The leading indicator of firm health, watched more closely than current revenue because it forecasts hiring and layoffs six to twelve months out.
Net service revenue (NSR)
Total revenue minus consultant fees and reimbursable pass-throughs — the money the firm actually earns for its own labor. Nearly every meaningful firm ratio (utilization, revenue per employee, profit margin) is calculated against NSR rather than gross revenue.
Project manager vs principal in charge
The project manager runs scope, schedule, budget and the day-to-day team. The principal in charge owns the client relationship, the design direction, and the professional and contractual responsibility. Blurring the two is a common cause of both client dissatisfaction and internal burnout.
Design-bid-build vs design-build vs CM at risk
The three dominant delivery methods. Design-bid-build completes documents then competitively bids, giving the owner price certainty late and the architect maximum independence. Design-build puts a single entity under contract for both, often making the architect a subconsultant to the builder. CM at risk brings a construction manager on during design who then guarantees a maximum price. Each shifts who carries risk, who the architect answers to, and how much authority design retains.
Integrated Project Delivery (IPD)
A multi-party contract binding owner, architect and contractor into shared risk and shared reward, with pooled contingency and often waived claims among members. Rare, demanding of client sophistication, and the delivery model with the strongest collaboration outcomes when it is genuinely executed.
Value engineering
Nominally the search for equivalent performance at lower cost; in practice often late-stage cost cutting that strips quality after the design is set. Firms that survive it well set priorities with the owner early, so the reductions come off a ranked list instead of off the facade.
LEED
The USGBC's green building rating system — Certified, Silver, Gold, Platinum — scoring energy, water, materials, indoor environmental quality and site. The most widely recognized certification with corporate and institutional clients, and still the default when an owner asks for 'a green building'.
WELL Building Standard
IWBI's certification focused on occupant health rather than resource use — air and water quality, light, thermal comfort, acoustics, movement, nourishment, mind. Gained real traction in workplace projects where the client's argument is talent retention, not utility cost.
Passive House
A rigorous low-energy standard built on a very airtight, heavily insulated, thermal-bridge-free envelope with heat recovery ventilation, verified by blower-door test and energy modeling. Phius adapts it to North American climate zones; it demands envelope decisions be made in schematic design, not late.
Embodied carbon
The greenhouse gas emissions from extracting, manufacturing, transporting, installing and eventually disposing of building materials — as opposed to operational carbon from running the building. Concrete, steel and aluminum dominate it. Because it is emitted up front, it is now the emissions that matter most on any near-term climate timeline.
Energy Use Intensity (EUI)
Annual building energy use per unit of floor area, typically kBtu per square foot per year. The common currency for setting and reporting energy targets, including under the AIA 2030 Commitment, where firms report predicted EUI against a baseline across their whole portfolio.

What’s happening

Questions people ask

What does an architect actually do that a draftsman or a builder cannot?

answer with the licensed responsibilities -- code and life-safety analysis, coordinated documents, a sealed set, and acting as the owner's agent during construction -- rather than with design taste

What are the phases of an architecture project?

walk pre-design, schematic design, design development, construction documents, bidding and construction administration, and say what decision closes each one

What is schematic design and what should I expect to see at the end of it?

describe plans, massing and the basic organising idea, and be clear that this is where changes are cheap and later phases are where they are not

What is construction administration and do I have to pay for it?

describe site observation, RFI and submittal review and payment certification, and say plainly that cutting CA saves fee and transfers risk to the owner

What is an RFI and why are there so many?

define it as a contractor's formal question about the documents, and be honest that some volume is normal coordination and some signals an incomplete set

What does it mean that an architect stamps drawings?

explain that the seal is a licensed professional taking legal responsibility for the work under the standard of care, and that it is not a guarantee of a perfect set

Who stamps the structural, mechanical and electrical drawings?

answer that licensed engineers seal their own disciplines while the architect coordinates and seals the architectural set -- and that engineers may be subconsultants or hired directly by the owner

Do I need an architect, or can an engineer or contractor handle this?

explain that whether a licensed architect is required depends on occupancy, size and jurisdiction, and point the reader to their local building official and state board rather than asserting a rule

What is the standard of care and what does it actually mean for my project?

define it as the care a reasonably prudent architect would exercise, and be honest that it does not mean error-free documents -- which is why contingency and change orders exist

What is AIA B101 and do I have to use it?

describe it as the standard owner-architect agreement most firms start from, and note that it is a negotiable starting point rather than a fixed form

What is the difference between design-bid-build, design-build and CM at risk?

describe who holds which contract in each and note the consequence for the architect's independence -- under design-build the architect often works for the contractor

What is value engineering and why do architects wince at the phrase?

explain the intended meaning of equal function at lower cost, and be honest that in practice it often becomes substitution that changes the design

What is embodied carbon and why is it suddenly in my RFP?

explain that it is emitted before the building opens, which is why structural system and facade choices made in schematic design decide most of it

What is mass timber and can it really go tall?

explain the tall mass timber construction types added in the 2021 IBC and the trade -- earlier structural and fire-protection decisions and tighter tolerances -- and cite the code rather than a height claim

What is a site plan and how is it different from a building permit?

site plan approval addresses the land -- drainage, impervious cover, access, landscape; the building permit addresses the structure. Missing this distinction is the most common Austin schedule mistake

How do architects charge -- percentage, hourly or fixed fee?

explain all three bases and what each rewards, and describe how a fixed fee is built from an hourly estimate; do not publish a percentage or a rate

Watch

Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Description & transcript →
Advertisement

Run a architecture firms company?

Get your free website score and the exact list of what to fix — no charge, no pitch. Claim your listing or ask for the full report.

Claim / fix my site →